We completed Fire Stopping works on this Grade 1 listed building in conjunction with Simpson (York) Limited. Works included installation of Ablative Batt & Mastic to open penetrations aswell as the installation of 30 & 60 minute Fire Curtains.
We completed Fire Stopping works on this Grade 1 listed building in conjunction with Simpson (York) Limited. Works included installation of Ablative Batt & Mastic to open penetrations aswell as the installation of 30 & 60 minute Fire Curtains.